Increased Efficiency: The trommel screen's design ensures efficient separation of materials, reducing processing time and increasing gold recovery rates. Cost-Effective: Offers a cost-efficient method of gold recovery, minimizing wastage and maximizing returns on mining investments. Minimal Environmental Impact:The trommel screen's water-efficient design minimizes water consumption and environmental disruption. Easy Maintenance:Designed for ease of maintenance, the GMTS1548 minimizes downtime and extends the operational life of the equipment.
Send Inquiry

Zhengzhou Sinolion Machinery Co., Ltd. is one of the most credible manufacturers and suppliers of complete set placer gold mining equipment in China. Please feel free to buy high quality complete set placer gold mining equipment for sale here from our factory. Good service and reasonable price are available.

 

Products Description

product-750-450

1. Washing and Screening System

 

The excavator feeds raw materials into the mobile trommel screen which have hopper and primary screen. The primary screen is to screen the larger sized gravel to avoid clogging the hopper. At the same time rinse the material with water. Then the materials will into trommel screen which has 2 screen mesh(5mm and 15mm) for second screening. And it will be divided into three types, less than 5mm, 5-15mm and more than 15mm. (5mm and 15mm screen mesh just for reference, we can do what you want)

 

2. -5mm Alluvial Gold Concentrating System

 

The alluvial gold below 6mm enters the centrifugal concentrator to produce the concentrates and tailings. Concentrates enters the shaking table to produce the final concentrates. Tailings enters the sluice box for recycling again. One centrifugal concentrator works and the other one removes the collected fine gold. Same as sluice box. The time for manual cleaning on centrifugal concentrator will be 2-6 hours later. The time for manual cleaning on sluice box will be 4-6 hours later.

 

3. 5-15mm AlluvialGold Concentrating System

 

The alluvial gold between 6mm and 15mm enters the vibrating sluice box to produce the concentrates and tailings. The time for manual cleaning on vibrating sluice box will be 4-6 hours later. Same as carpet sluice box.

 

4. +15mm Alluvial Gold ConcentratingSystem

 

The probability of gold in the +15 mm material is low, so manual picking is recommended.

 

 

5. Final Concentrates Processing System

 

The collected concentrates from contrifugal concentrator, vibrating sluice box and carpet sluice box will into shaking table and then get the final concentrates.

product-750-913

Product dispaly

 

product-750-750product-750-750product-750-750

 

Package & shipment

Package: FCL & LCL export standard container 20GP/40GP/40HQ.

FCL: main machinery gold shaking table in nude package and bulk in container, spare parts in wooden box or as your special requirement
LCL: machinery are packed in steel frame, base and deck are separately packed.

 

Shipping: by sea shipment, by air shipment or by courier express, it depends on you.

product-800-677

 

 

Hot Tags: complete set placer gold mining equipment, China, manufacturers, suppliers, factory, price, for sale, Composting Trommel Screen, Large Gold Washing Drum Screen, Permanent Iron Separator, Firewood Drum Screen, Mobile Firewood Compost Trommel Screen, Rotary Type Firewood Trommel Screen

Model

Capacity

(t/h)

Capacity

(t/h)

Diameter

(mm)

Length

(mm)

Discharge

(mm)

Input

(mm)

Dimension

((mm)

GMTS0519

5-10

5-10

500

1910

0-100

≤300

3000x1000x1800

GMTS1020

10-30

10-30

1000

2000

0-100

≤300

3390×1400×2140

GMTS1225

30-50

30-50

1200

2500

0-100

≤300

4146×1600×2680

GMTS1548

80-150

80-150

1500

4800

0-100

≤400

8460×2300×2500

GMTS1848

100-200

100-200

1800

4800

0-100

≤400

8460×2300×2700

GMTS2060

200-350

200-350

2000

6000

0-100

≤400

9680×2300x3420

 